Heres the latest video on the shop wall renovation. Not a whole lot of progress, but I did manage to finish the last of the electrical access panel frames.This last frame was the tricky one, incorporating a door to reach the electrical panel. Next up in the shop will be filling the 2nd layer of insulation around the electrical access and window frames.
Related Posts by Categories
0 komentar:
Posting Komentar